ITEM: AUTHORIZATION TO UTILIZE A PALM BEACH COUNTY CONTRACT FOR MULTIPURPOSE PATHWAY, PARKING LOT, AND SIDEWALK IMPROVEMENTS
REQUEST: Authorization to utilize a Palm Beach County contract (Project #2022063) with Wynn & Sons Environmental Construction Co., LLC., as a basis for pricing, for the multipurpose pathway, sidewalk, and parking lot improvements at multiple Village locations in the total amount of $923,877.50.
…body
EXPLANATION: The Public Works Department is requesting authorization to utilize a Palm Beach County contract with Wynn & Sons Environmental Construction Co., LLC. For the multipurpose pathway, sidewalk, and paving improvements at multiple Village locations. Palm Beach County executed their contract (Project #2022063) on March 14, 2023 and it expires March 13, 2026.
The projects were identified as priority areas for rehabilitation due to aging pavement, root intrusion, slope issues, and concrete degradation. Pathway improvements are planned for completion during the Thanksgiving and/or Christmas holiday breaks to reduce impact on pedestrian traffic to and from area schools. All other work will be finalized before any new contract or price adjustments take effect.
These improvements will directly enhance pedestrian and vehicular safety, rectify ADA compliance issues, improve stormwater drainage, and extend the service life of the Village’s infrastructure. Completing this work now maintains the Village’s paving schedule and ensures coordination with other projects.
The proposed work includes the following locations and scope:
|
Location / Description |
Scope of Work |
Amount |
|
Bent Creek Road (North Side) |
Pathway reconstruction including milling, asphalt repair, and root mitigation |
$58,525.00 |
|
Binks Forest Drive (East Side, from Aero Club to Southern Blvd) |
Pathway reconstruction correcting cross-slope issues and root intrusion through milling, asphalt overlay, and regrading |
$126,600.00 |
|
Public Works Parking Lot (Multiple Sections including Sheriff Station) |
Comprehensive rehabilitation including milling, full-depth asphalt replacement, curb repair, and regrading across multiple sections |
$369,352.50 |
|
Village wide Concrete & Sidewalk Improvements (Mulberry, Avondale Woods, Guilford) |
Replacement of deteriorated concrete sidewalks, curbs, and valley gutters; includes excavation and base preparation |
$369,400.00 |
|
Total Estimated Amount |
|
$923,877.50 |
Staff recommends authorization to utilize the Palm Beach County contract (#2022-063) with Wynn & Sons Environmental Construction Co., LLC., as a basis for pricing, in the total amount of $923,877.50 for multipurpose pathway, sidewalk, and parking lot improvements at the locations listed above.
BUDGET AMENDMENT REQUIRED: NO
PUBLIC HEARING: NO QUASI-JUDICIAL:
FIRST READING: SECOND READING:
LEGAL SUFFICIENCY: YES
FISCAL IMPACT: Funds are available in the FY 2026 Roads Major Maintenance Budget.
WELLINGTON FUNDAMENTAL: Responsive Government
RECOMMENDATION: Authorization to utilize a Palm Beach County contract with Wynn & Sons Environmental Construction Co., LLC., as a basis for pricing, for the multipurpose pathway, sidewalk, and parking lot improvements in the total amount of $923,877.50.