File #: 18-1979    Name: AUTHORIZATION TO UTILIZE AN EXISTING CONTRACT FOR THE FOREST HILL BOULEVARD CONFLICT STRUCTURE PROJECT
Type: Purchasing/Contract
Body: Village Council
Agenda Date: 4/10/2018 Final action:
Title: ITEM: AUTHORIZATION TO UTILIZE AN EXISTING CONTRACT FOR THE FOREST HILL BOULEVARD CONFLICT STRUCTURE PROJECT REQUEST: Authorization to utilize a previously awarded contract with D.S Eakins Construction Corporation, for the Forest Hill Boulevard conflict structure, in the amount of $85,000.00.
Attachments: 1. 1. D. S. Eakins Proposal, 2. 2. D. S. Eakins Plans
Date Action ByActionResultVoteMeeting DetailsVideo
No records to display.
...title
ITEM: AUTHORIZATION TO UTILIZE AN EXISTING CONTRACT FOR THE FOREST HILL BOULEVARD CONFLICT STRUCTURE PROJECT

REQUEST: Authorization to utilize a previously awarded contract with D.S Eakins Construction Corporation, for the Forest Hill Boulevard conflict structure, in the amount of $85,000.00.

...body
EXPLANATION: A sinkhole has recently developed in the traffic median on Forest Hill Boulevard and Montauk Drive. After further investigation, it was determined that the directional drill operation for the installation of the reuse water line had drilled through the storm sewer pipe, thus causing the sinkhole. The reuse water main project was completed several years ago. Upon discovery of the sink hole, the Public Works Department filled the sink hole and temporarily patched the road to "safe up" the area. The Engineering Department designed a conflict structure for the repair of the pipe and would like to complete the project as soon as possible to avoid additional damages.

On July 14, 2015, Council approved an annual contract (#007-15/DZ) with multiple vendors to provide various services including the installation of drainage pipe and structures. The initial term of the contract is for three (3) years, expiring on July 14, 2018. D.S. Eakins Construction Corporation was one of the awarded vendors. Staff has determined that this contract is the best option for the completion of the required repair and construction.

Staff is seeking authorization to D.S. Eakins Construction Corporation, the lowest priced awarded vendor, under their existing approved contract for the Forest Hill Boulevard conflict structure project at a cost of $71,104.00. The scope of work includes all labor, project site dewatering, equipment and operators, as well as maintenance of traffic (MOT), construction/ materials testing, precast structure, median repairs and the roadway repairs (base rock, asphalt mill & overlay and striping). D.S. Eakins Construction Corporation has an ex...