File #: 18-2080    Name: AUTHORIZATION TO UTILIZE A MARTIN COUNTY CONTRACT WITH WHARTON SMITH, INC., AS A BASIS FOR PRICING, FOR PROCESS BASIN 3 EMERGENCY REPAIRS AT THE WATER RECLAMATION FACILITY, AND APPROVAL OF RESOLUTION NO. R2018-22 AMENDING THE UTILITY FUND MAJOR MAINTENAN
Type: Purchasing/Contract
Body: Village Council
Agenda Date: 5/8/2018 Final action:
Title: ITEM: AUTHORIZATION TO UTILIZE A MARTIN COUNTY CONTRACT WITH WHARTON SMITH, INC., AS A BASIS FOR PRICING, FOR PROCESS BASIN 3 EMERGENCY REPAIRS AT THE WATER RECLAMATION FACILITY, AND APPROVAL OF RESOLUTION NO. R2018-22 AMENDING THE UTILITY FUND MAJOR MAINTENANCE BUDGET TO PROVIDE FUNDING REQUEST: Authorization to utilize Martin County Contract #RFB2015-2813 with Wharton- Smith, Inc., as a basis for pricing, for the Process Basin No. 3 repairs at the Water Reclamation Facility in an amount not to exceed $225,000 and approval of Resolution No. R2018-22.
Attachments: 1. 1. Resolution R2018-22 Water Reclamation Basin #3 Emergency Repair, 2. 2. Wharton Smith Proposal Basin 3, 3. 3. Location of Basin 3 Repair, 4. 4. Basin Repair Plan
Date Action ByActionResultVoteMeeting DetailsVideo
No records to display.
...title
ITEM: AUTHORIZATION TO UTILIZE A MARTIN COUNTY CONTRACT WITH WHARTON SMITH, INC., AS A BASIS FOR PRICING, FOR PROCESS BASIN 3 EMERGENCY REPAIRS AT THE WATER RECLAMATION FACILITY, AND APPROVAL OF RESOLUTION NO. R2018-22 AMENDING THE UTILITY FUND MAJOR MAINTENANCE BUDGET TO PROVIDE FUNDING

REQUEST: Authorization to utilize Martin County Contract #RFB2015-2813 with Wharton- Smith, Inc., as a basis for pricing, for the Process Basin No. 3 repairs at the Water Reclamation Facility in an amount not to exceed $225,000 and approval of Resolution No. R2018-22.

...body
EXPLANATION: The Utility has hired the Professional Engineering firm of Hazen and Sawyer to prepare a Master Plan for the Water Reclamation Facility on Pierson Road. A major component of the Master Plan includes structural inspections of all treatment structures. During the course of the inspections, Hazen and Sawyer identified a critical structural issue with Process Basin No. 3. There are three (3) process basins on the plant. These basins are extremely large concrete structures and are the second step in the wastewater treatment process. Basin 3 is approximately 200 feet long, 100 feet wide and 20 feet deep and holds approximately 3.0 million gallons of untreated effluent. Basin 3 was constructed in 2009. Due to the safety concerns, Hazen and Sawyer recommended taking Basin 3 out of service to avoid a complete failure of the basin wall. The Basin is currently out of service. Until such time as the repair is made, the plant has no treatment redundancy in case of an emergency. The repair design was completed by Hazen and Sawyer. Hazen and Sawyer is unable to determine the cause of the failure without a forensic analysis. A forensic analysis is not being recommended as it would add significant cost and time and may require destructive analysis which could further weaken the structure. A copy of the plans, an aerial location map and a memorandum from Hazen and Sawyer summarizing their finding...