File #: 17-1618    Name: AUTHORIZATION TO APPROVE A TASK ORDER TO PROVIDE ENGINEERING CONSULTING SERVICES FOR THE SOUTH SHORE FORCEMAIN REPLACEMENT PROJECT PHASE I
Type: Purchasing/Contract
Body: Village Council
Agenda Date: 11/13/2018 Final action:
Title: ITEM: AUTHORIZATION TO APPROVE A TASK ORDER TO PROVIDE ENGINEERING CONSULTING SERVICES FOR THE SOUTH SHORE FORCEMAIN REPLACEMENT PROJECT PHASE I REQUEST: Authorization to approve a task order to Mock Roos and Associates, Inc. to provide engineering consulting services for design and bid phase services for South Shore Forcemain Replacement Phase I at a cost of $145,396.
Attachments: 1. 1. Mock Roos South Shore Forcemain Proposal, 2. 2. Excerpt 2 - South Shore Blvd Wastewater Forcemain Route Study Report
Date Action ByActionResultVoteMeeting DetailsVideo
No records to display.
...title
ITEM: AUTHORIZATION TO APPROVE A TASK ORDER TO PROVIDE ENGINEERING CONSULTING SERVICES FOR THE SOUTH SHORE FORCEMAIN REPLACEMENT PROJECT PHASE I

REQUEST: Authorization to approve a task order to Mock Roos and Associates, Inc. to provide engineering consulting services for design and bid phase services for South Shore Forcemain Replacement Phase I at a cost of $145,396.

...body
EXPLANATION: On January 12, 2016, Council awarded an engineering services contract (011-15/ED) to multiple vendors. As part of the solicitation, Mock Roos & Associates, Inc. was selected as one of Wellington's engineering service providers. Staff is seeking authorization to utilize such contract with Mock, Roos and Associates, Inc. to provide engineering consulting services for South Shore Forcemain Replacement Phase I project, including engineering and permitting.

The Utility owns and operates a wastewater forcemain system that includes approximately sixty (60) miles of pipe and 106 lift stations. This pressurized system delivers domestic waste to the Water Reclamation Facility for treatment. The forcemain backbone is located on South Shore Boulevard. This system was constructed in the early 1980's and includes PVC Class 160 pipe, which is inferior to typical construction materials used today. The pipeline is reaching forty (40) years of age and is nearing its useful life. Accordingly, the forcemain has been prioritized for replacement due to its age and the fact that it was constructed utilizing substandard material. Replacement of the pipeline will also provide operational redundancy in the system and will be designed to meet future growth. The existing forcemain is located on the north side of South Shore Boulevard. A forcemain routing study was conducted to review existing as-builts, evaluate the road right of way for replacement locations, evaluate methods of construction and prepare a preliminary opinion of construction cost. Routing considerations included field condi...