File #: 18-2491    Name: AUTHORIZATION TO UTILIZE A PALM BEACH COUNTY CONTRACT WITH WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO., INC. FOR THE FOREST HILL BOULEVARD BUS STOP DRAINAGE REPAIR
Type: Purchasing/Contract
Body: Village Council
Agenda Date: 12/11/2018 Final action:
Title: ITEM: AUTHORIZATION TO UTILIZE A PALM BEACH COUNTY CONTRACT WITH WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO., INC. FOR THE FOREST HILL BOULEVARD BUS STOP DRAINAGE REPAIR REQUEST: Authorization to utilize Palm Beach County contract #R2018-0012 with Wynn & Sons Environmental Construction Co., Inc., as a basis for pricing, for the Forest Hill Boulevard Bus Stop Drainage Repair at a cost of $41,892.00.
Attachments: 1. 1. Progress 2018 - 1024 - Plans, 2. 2. Estimate #2991 - Wynn & Sons Environmental Construction Co., Inc. 11680, 3. 3. Location Map
Date Action ByActionResultVoteMeeting DetailsVideo
No records to display.
...title
ITEM: AUTHORIZATION TO UTILIZE A PALM BEACH COUNTY CONTRACT WITH WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO., INC. FOR THE FOREST HILL BOULEVARD BUS STOP DRAINAGE REPAIR

REQUEST: Authorization to utilize Palm Beach County contract #R2018-0012 with Wynn & Sons Environmental Construction Co., Inc., as a basis for pricing, for the Forest Hill Boulevard Bus Stop Drainage Repair at a cost of $41,892.00.

...body
EXPLANATION: The Public Works Staff inspected an area of asphalt pavement rutting/deterioration located in front of the bus stop near the intersection of Forest Hill Boulevard and Wellington Trace (north). The pavement problem is caused by storm water getting trapped in the existing swale, when the bus stop was originally constructed. This in turn, has caused the water table to be higher in this area, which has subsequently caused the asphalt pavement issue.

The Engineering Department has completed the design of the project. A "dog house" drainage structure will be set over the existing drainage pipe. The drainage structure will then allow the trapped storm water to be removed from the area. Associated work such as concrete/asphalt work, maintenance of traffic, curb replacement, grading, sodding, dewatering and irrigation repair will also be completed as part of this project.

The Engineering Staff recommends Wynn & Sons Construction Company, utilizing a previously awarded unit price contract, to complete this project.

Staff recommends utilizing Palm Beach County contract #R2018-0012, as a basis for pricing, with Wynn & Sons Environmental Construction Co., Inc., a Western Communities local vendor, for the Forest Hill Blvd Bus Stop Drainage Repair in the amount of $41,892.00, including a twenty percent (20%) contingency for any unforeseen conditions.

BUDGET AMENDMENT REQUIRED: NO

PUBLIC HEARING: NO QUASI-JUDICIAL:

FIRST READING: SECOND READING:

LEGAL SUFFICIENCY: YES

FISCAL IMPACT: Funds for this project are available...

Click here for full text