...title
ITEM: AUTHORIZATION TO: 1) AWARD A CONTRACT FOR THE WASTEWATER TREATMENT FACILITY RENEWAL AND REHABILITATION PROJECT; AND 2) APPROVAL OF RESOLUTION NO. R2019-12 AMENDING THE UTILITY FUND FOR FISCAL YEAR 2018-2019 BY ALLOCATING FUND BALANCE FOR THE WASTEWATER TREATMENT FACILITY RENEWAL AND REHABILITATION PROJECT; AND PROVIDING AN EFFECTIVE DATE.
REQUEST: Authorization to: 1) Award a contract to Wharton Smith, Inc. for the Wastewater Treatment Facility renewal and replacement project at a cost of $19,042,020.00; and 2) Approval of Resolution No. R2019-12 amending the Utility Fund for Fiscal Year 2018-2019 by allocating fund balance for the Wastewater Treatment Facility renewal and replacement project; and providing an effective date.
...body
EXPLANATION: Staff is seeking authorization to:
1. Award a contract to Wharton Smith, Inc. for the Wastewater Treatment Facility renewal and replacement project at a cost of $19,042,020.00. This project includes significant renewal, replacement and expansion items including:
* Installation of an influent flow meter
* Structural and mechanical rehabilitation of the headworks
* Demolition and replacement of the headworks odor control system
* Improvements to the filter backwash mudwell
* Installation of a new tertiary Filter No. 4
* Various improvements to the dewatered biosolids systems
* Construction of a new control building, reuse control building, and blower building
* Modifications to the existing operator's building
* Replacement of the existing sodium hypochlorite and sodium hydroxide chemical feed loop piping
* Painting and coating all new and existing infrastructure
* Miscellaneous concrete crack repair
* Site civil improvements including paving, grading, and drainage
* Various walkway, stairway, and handrail rehabilitation and improvements
* Corresponding demolition work
* Supporting electrical and instrumentation systems and various appurtenances associated with the above
On Novembe...